SEPIA  ·  ← roadmap  ·  all docs

SEPIA — evaluation & QC plan (retired — now merged into `plan.md`)

SEPIA — evaluation & QC plan (retired — now merged into plan.md)

This file has been retired. Its 10 reviewer-driven, unit-test-style QC checks are now tracked as first-class items Q1–Q10 inside the single master plan, plan.md §4, interleaved with the fixes/builds they verify (each Q item sits in the phase whose work it proves, with full acceptance criteria, subtasks, deliverable, and communication artifact). There is no longer a separate QC to-do list — track everything in plan.md.

Where each check went (same two guiding principles as before — provenance before analysis, and reproduce known truth first / positive controls):

Was (evaluation item) Now (plan.md) Phase
1. Data-provenance manifest + checksums Q1 0
2. Genome-build & contig-naming lint (tracer SNPs) Q2 1
3. Positive control — reproduce SGDP WG-PCA Q3 2
4. Allele & annotation harmonization Q4 1
5. PCA / projection non-degeneracy Q5 2
6. Per-sample coverage expectations Q6 2
7. Sample identity, sex & contamination Q7 3
8. aDNA authenticity / damage handling Q8 3
9. Cross-validation vs published + orthogonal predictor Q9 4
10. Reproducibility infra (versions, seeds, DAG, CI) Q10 (+ Q10a in Phase 0) 5

See plan.md for the live, checkbox-tracked versions. Dated history is in changelog.md.